‌                                   Waste mud treatment project of a highway bridge pile foundation project


1. 打桩现场.webp

Project background

Project type: Construction of ultra-deep bored piles for highway bridges (pile diameter 1.2m, depth 30m)

Mud source: Drilling process wall mud (bentonite base) + formation drill cuttings (high sand content)

Core problem:

Daily waste mud volume is 100m³, water content > 90%, and cannot be directly transported;

Land stacking has high land occupation cost;

Treatment target

Reduction: Mud volume reduction ≥ 70%

Resource utilization: Separate sand and gravel for roadbed backfill, and recycle filtrate

III. Solution and technical process

Treatment process: Modular "mechanical dehydration + chemical solidification + water treatment" system

Key steps:

Flocculation conditioning:

Add PAC (polyaluminium chloride) + PAM to destroy the colloidal structure of mud;

Deep dehydration (plate and frame filter press):

Pressure 1.5MPa, the moisture content of mud cake after dehydration is ≤40% (the moisture content of original mud is 92%).

Process: Mud sampling, PAM selection and approximate dosage test in the laboratory

Below is the jar test for PAM type selection:

图片1.jpg


After testing, select the model with the best effect and the best usage, and verify it again


图片2.jpg


On-site effects